Jump to content

Kitchen progress, part 2


otterine

The main component pieces of the kitchen are Euro Mini's, but I used two base cabinets by Houseworks with four drawers on either side of the oven.<i> </i>Since the drawer cabinets come from a different manufacturer, I had to make a few adjustments to make them blend with the Euro Mini's. I added a front baseboard, a thin strip of wood above the top drawer to make the front flush and cut a countertop with a backsplash. I also had to raise the oven with a base from scrap wood. I might end up painting the base black to make it less obvious since the silver seems off to me. I still need to finish the countertops and add hardware, too. The backsplash shown is a sheet of scrapbook stickers; they are plastic and iridescent. I don't know if I will use these exact pieces, but I plan to add some sort of backsplash behind the oven.

From the album:

The Newport

· 150 images
  • 150 images
  • 0 comments
  • 619 image comments


Recommended Comments

You know, been eyeing those cabinets from Houseworks for the Jefferson rehab project (hopefully it's next). How are they in terms of assembly? I think HBS sells them either as a DIY kit or you can get them partially assembled.

Other than that --- LOVE the Miele oven! Where'd you get it? Was tempted to buy it at a miniature fair, but was hesitant to pick it up for fear I wouldn't use it later.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...