Jump to content

BH_kitchenside_3floor_r.JPG


HBMini

1st floor kitchen.

I have fixed the wall, floor and ceiling where I added 3 inches. The dumbwaiter front panel is done. The door in the panel slides up and down to allow access to the working dumbwaiter. I have modified the wall on the left side to add 3 larger windows to the kitchen. I still have not finished those windows.

2nd floor hobby room over the kitchen

I have fixed the wall, floor and ceiling where I added 3 inches. The dumbwaiter front panel is done. The door in the panel slides up and down to allow access to the working dumbwaiter. I have added the crown moulding around the ceiling. I took the window parts that came with the kit for the kitchen bay and used the pieces in this side wall. This room is going to be the hobby room, because all houses should have a hobby room for building dollhouses.

3rd floor bathroom over the kitchen

I have fixed the wall, floor and ceiling where I added 3 inches. The dumbwaiter front panel is done. The door in the panel slides up and down to allow access to the working dumbwaiter. This room is now big enough to be a bathroom. Seems weird to have a dumbwaiter in the bathroom. Maybe they use it to get those clean dry towels upstairs from the laundry room

From the album:

My Beacon Hill

· 36 images
  • 36 images
  • 0 comments
  • 53 image comments


Recommended Comments

There are no comments to display.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...