Jump to content

rsz_20201127_231614.jpg


Medieval
  • Like 2

From the album:

Pierce Re-Build

· 115 images
  • 115 images
  • 0 comments
  • 275 image comments

Photo Information

  • Taken with samsung SM-T560NU
  • Focal Length 3.3 mm
  • Exposure Time 1/24
  • f Aperture f/2.2
  • ISO Speed 100

Recommended Comments

Today's work was finishing subway tiles. I still have to put caps on right wall. Cause I used the flooring to outline the room, and created a "hallway" past bathroom to smaller bedroom, I put up a 2nd piece to create shelving outside the bathroom. For towels and bedsheets. Idk if I can make a door. But I might try. All that's left is to grout. And seal. Then on to the next wall!

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...