Jump to content

replaced walls


Debora59

Originally the Beaumont has walls and a door on the 2nd floor [ hallway ] for a bathroom. I didnt like it at all it hide that beautiful window. So I made this rail for the stir opening. I like it much better. This is a dry fit, I have to stain the rungs and paint the hand rail white.

From the album:

The Beaumont Dollhouse

· 61 images
  • 61 images
  • 0 comments
  • 212 image comments


Recommended Comments

I have thought of a sink, toilet maybe shower in the hallway but almost anything in the hallway blocks my view of that window.

I could make the attic a bath or take the 2nd bedroom for a large luxurious bath and put another bedroom on the 3rd level. I may leave it out all together not sure.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...