Jump to content

Study progress, part 3


otterine

In order to decorate for Christmas, I had to get the study in nearly complete order. I sprayed the wood flooring with matte sealer (two coats). I like how it warmed up the color and brought out the detail of the wood grain.<br /><br /> I used Houseworks baseboards along the perimeter. I think this has been my least favorite part so far, but it really adds a lot of realism to the room, so I just keep cutting and cutting and cutting until I get the pieces right.<br /><br />I used Houseworks trims around the interior of the windows to match the Traditional Block &amp; Trim interior door, also by Houseworks. The windows and their related interior trims are not glued in place so I can remove them to continue the build without any worry of damaging them.

From the album:

The Newport

· 150 images
  • 150 images
  • 0 comments
  • 619 image comments


Recommended Comments

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...