12/3 #2
Another photo of 1st floor pieces. The back wall 3 pieces are stained and drying. The posts were cut from 1:12 12in porch posts down to 6" for the ballisters. Staircase will help hold up back wall and support the 2 sides. It is on to the staircase.
Photo Information
- Taken with EASTMAN KODAK COMPANY KODAK EASYSHARE Z8612 IS Digital Camera
- Focal Length 5.9 mm
- Exposure Time 1/30
- f Aperture f/2.8
- ISO Speed 500
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.