Bashing mostly complete
I filled in the original door opening with sheets of balsa and basswood since I had it on hand. I've put in a spare piece of foam for the front floor until I get the cut pieces of 3/8" plywood back from my parents (they have better power tools).
I cut the new door opening on the other side and made the removable bathroom wall from 1/4" plywood. I glued in the plugs on the back wall and filled in the remaining loft support notch.
Next, I need to plan the deck so I can buy a piece of wood for the landscape base.
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.