Top level flooring
The floor needed a weathered red paint worn down to the cement where the tires contact the surface. The wall surface has been painted black with the beginnings of door panels. The doors on the second level are not functional.
The floor needed a weathered red paint worn down to the cement where the tires contact the surface. The wall surface has been painted black with the beginnings of door panels. The doors on the second level are not functional.
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.