walls
So I could test the electric, I glued the first and second floors and the right and left walls. Had trouble making the tabs fit in the slots and had to do some slicing. Also glued on the base and prepared the tabs on the third floor. Told my husband that I assembled the floors and walls so I could test the electric and he suggested I just stick it in on the end somewhere, so I did. Yippee! It works! I passed the inspection by my husband. He’s a building inspector, so this was necessary.
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.