Added second floor
Going nicely! I managed to fiddle the floor in.
It's still some trial and error - for an example the tabs should be sanded down more than I expect for them to fit. I also need to use way more tape to keep everything together for the dry fit.
I decided that I'm through with preparing each part halfway during assembly! I wrote down which parts are needed during which steps and from now on I will prepare all the required parts before starting the next 'chapter'. Much easier.
Hopefully I can get the stairs dry-fitted today!
Recommended Comments
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.