Progress with base added
I added a strip of bass wood around the top edge of the clock room and then glued brackets in place. These came from Ross' Miniatures in North Vancouver and were originally for The Brownstone. I have other plans now. I needed a base so it wouldn't be top heavy. I ended up finding a suitable base at Joann. It's a board with a frame attached to the base. I added some Real Good Toys railings around the edge. Here's a look at one of the dry fit photos of the build progress.
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.