Jump to content
Started front wall
 
© MP 2012

Started front wall


mesp2k
 Share


The front wall archway is cut out. Above arch added 5.5mm plywood + poster board to = 1/4" thickness, cut on band saw, will finish with inside trim (veneer or poster board.) String between window & archway for outdoor & entry light paths.

Copyright

© MP 2012
From the album:

Pack away dollhouse

  • 38 images
  • 0 comments
  • 63 image comments

 Share


Recommended Comments

There are no comments to display.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...