Jump to content

Most of the wire tape runs installed


KathieB

Tonight was spent installing the tape wire runs, and I'm pleased to report that the tester lit up on every segment. :rolleyes: The trickiest bits were the two little dormers. I'm recycling some sconces that I'd converted to pin-ins for the charity dollhouse. Unfortunately, I put the pins in the wrong way. When installed, the sconces aimed sideways! I think it will be nice to have a light source inside the dormer to add light to the back of the room. It should make the stained glass windows glow when viewed from the outside, too.

I also painted the bathroom a light green and papered one wall in the living room. The floor still isn't installed. I just wanted to see what it looked like with the paper.

  • Like 1

From the album:

Orchid (build) by KathieB

· 72 images
  • 72 images
  • 0 comments
  • 37 image comments


Recommended Comments

There are no comments to display.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...