Work in Progress
Both floors have been glued. I have the second floor ceiling piece in place for fit but have not installed it yet.
I installed as much trim as possible while gluing everything in place because some areas will be virtually inaccessible later.
Copyright
© DAL Minis
-
1
Photo Information
- Taken with Apple iPad Air 2
- Focal Length 3.3 mm
- Exposure Time 1/30
- f Aperture f/2.4
- ISO Speed 125
Recommended Comments
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.