Installing "piers"
Dunno what these are called; rather than a foundation, this is the underside of the house's floor, turned upside down. The little piers hold it up off the larger base, so there's room to sand-scape around and under the house. Gluing the upright small pieces took forever, because I had to do a row or two and then stop to let the glue dry because otherwise I was knocking previous pieces out of alignment and getting them stuck to my arm. The angled cross braces took even longer because I had to mark and miter cut all the angles. You may be able to see some of the glue that hadn't dried yet when I took the picture--I am just so glad to be done with this process, which has taken more than 2 weeks because of glue drying and miter cutting and getting bored and wandering away!
- 2
Photo Information
- Taken with Apple iPhone 5s
- Focal Length 4.2 mm
- Exposure Time 1/40
- f Aperture f/2.2
- ISO Speed 40
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.