Jump to content
© brae oktober

Foundation secured


otterine

I'm nearing the end of the dry fit stage on the mill!  I have the foundation and main floor board glued, clamped and weighted.  I ran the wiring from the back through channels in the builders foam, and through the floor board.  I have regular dollhouse wires for the lighting and larger gauge wires for the motor since they need to run on different systems.  I should be out of dry fit this week. :D

Full post here.

Copyright

© brae oktober
  • Like 1

From the album:

Watson Mill

· 84 images
  • 84 images
  • 0 comments
  • 369 image comments

Photo Information


Recommended Comments

:D Indeed!  I like magazines since they conform to the shape you're pressing, unlike books or other weights.  But, you do have to alternate the direction so they don't tumble down.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...