BeaconHill-exterior-wip1.jpg
The progress on the exterior so far. I had a few days off so I tried to get as much work done on the structure as possible, I'm happy it's finally starting to look like a house
I'm currently working on the rest of the windows, because I'm using diferent colors it takes a really long time as I have to paint the trims before assembling. When I'm done I'll wallpapper the rest of the house, add the windows and remaining sinding, and then resume work on the interiors. The dormer windows.... are a real headache to put together. I'm not quite sure how I'm going to do it so that I can get a smooth curve, seams really hard to acomplish that with the window in place. I haven't glued the roof of the tower, I'll probably leave it like that to be easier to work. I haven't done any modification to this roof, I like it the way it is, I think I will have fun decorating it as the ceiling for the third floor hall.
- 1
Photo Information
- Taken with Apple iPhone 6s
- Focal Length 4.2 mm
- Exposure Time 1/33
- f Aperture f/2.2
- ISO Speed 100
Recommended Comments
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.