Jump to content

Kitchen area


SewMini

I'm a bit of a weirdo and I'm doing a bit of work in the kitchen before I completely attach the Primrose to the Orchid. I'm doing it this way because it's a bit easier for me to work out the kitchen "cabinetry." Since my house is for display, I'm not really concerned about having working doors and cabinets. With that in mind, I'm making the bones of my cabinets from foam core. I'll cover them with mat board, trim them out like real cabinets and then paint them. In the end they'll look like the real thing. For now, they're just the basic structure. 


From the album:

SewMini's Casa del Paó d'Or

· 90 images
  • 90 images
  • 0 comments
  • 246 image comments

Photo Information

  • Taken with Apple iPhone 6 Plus
  • Focal Length 4.2 mm
  • Exposure Time 1/15
  • f Aperture f/2.2
  • ISO Speed 50

Recommended Comments

Not weird at all. Smart way to work, when you have room for your hands before the first floor goes on. Plus you can get a handle on where you will need baseboard etc, without putting it in and then having to rip it out. 

I've built most of the components for my kitchen too and I don't even have any walls permanently up... lol

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...