Third floor progress
FINALLY got the 3rd floor stained and varnished and installed! Crown mouldings on the second floor are in - after I realized I didn't have enough of the intended moulding I changed gears and went to AC Moore and got some pieces so I could just get this done! Also got the 3rd floor walls glued in. Ready to raise the roof!
- 1
Photo Information
- Taken with Canon Canon EOS REBEL T5
- Focal Length 23 mm
- Exposure Time 1/30
- f Aperture f/3.5
- ISO Speed 400
Recommended Comments
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.