Willowcrest 2 progress.
Well there has been a bit of work here, getting the 1st floor staircase ready to install:
Here the assembled staircase is drying while I have it in place where it will sit in the house, to try to keep it square.
But before I can install the staircase for good, a number of things have to happen in this little foyer, because once all the walls go up, there is no getting in there; this time around, I have installed the front door first off so that I don't have all the trouble I had last time (when I installed it pretty much last):
Stair-runner and railing:
Foyer ceiling and light, and ceiling moulding all have to be installed first:
Here I am looking at how the 2nd floor staircase will fit:
I am installing my own railing, so the kit railing gets lopped off the wall piece:
Here the staircase is finally installed, and I am working on the 2nd floor foyer before installing the right wall:
Some views of the 1st floor foyer:
Now that the right wall is installed, overhead view into the foyers:
Here is the parlor wallpaper, which I love:
Back view of the house so far with 3rd floor dryfit:
Installing 3rd floor:
I'm installing the bays now and will be ready to start siding soon.
0 Comments
Recommended Comments
There are no comments to display.