Jump to content
  • entries
    176
  • comments
    201
  • views
    81,055

Glencroft progress


ilovecats

972 views

Yay, i finished the paperclay today! Just need to let it dry then do the wash! I have two rooms with wood flooring installed now! i still need to finish a side second floor roof panel (lost the original one so i made a new one today). I finished sanding all the door/window trim etc and stained it all today. Next on the list is to put the ceiling beams in! Then do the exterior wash/finish. After that i can install the flooring in the living room and kitchen and finish the stairway. Then all interior trim and windows!. really disappointed in the wash to the interior stonework. i did a wash, painted stones then to tone it down i did another wash. it was too dark and ruined it. i may go back and see if i can do anything to fix it but for now i'm going to leave it alone. Still need to cut and stain baseboards but that will be the last part of the project. wow, thought i was close to getting done until i listed all of the unfinished stuff.....lol. i'm including some photos of the glencrofts future resident!:wave: Her name is Amelia. I took some photos of her in her temporary residence, my other Glencroft.

4 Comments


Recommended Comments

Beautiful work! And, bravo for keeping it all straight building in reverse. :D If I ever get around to building my own, I want to do the same...so I'll be knocking on your reverse Glencroft door to pick your brain! :giggle:

Link to comment

Oh, I just love your Glencroft! Reversing the floor plan has worked out very well.

And, I just love Amelia, and in that Pumpkin custume -- what a charmer!

Link to comment
Guest
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...