Shingles done, adding accents, waiting
I'm really surprised at myself! It took me four days to place an order from HBS once my mini buying ban was lifted!
I was just worried that I'd forget something important, like I usually do, and was keeping a list. It was only because that 25% coupon expired last night that I finally ordered!
The bakery is in a bit of a quagmire. There are little things I can do, but I've slumped into vacation mode so I only seem able to tackle items that fill a day (such as the shingling which I finished Sunday), and the little things (cushion for the window seat and stones for the veranda) are being ignored.
I took down Tilly's Christmas decorations and now I'm bummed out. Not because I miss the holiday passed, but because it made her shop so warm and cozy and now it feels empty. At the same time I hesitate to fill it back up because of the little projects that still remain.
So here's a list and maybe at the end I'll have decided what I want to do next! Items with an asterisk are waiting on my HBS order.
Interior:
- make window seat cushion
- install knobs on cabinet doors
- install outlet and swap plug for bedside lamp
- make bed linens
- replace chandelier bulb*
Exterior:
- install trim under roof points
- touch up paint
- sculpt and paint stone floor on veranda
- find tiny eye screws
- paint and design shop sign
- install sign
- make greenery for window box
- decorate and install cupola*
- install door knobs*
- install doors*
- install veranda railing*
After that im really looking forward to trying my hand at sculpting miniature food. I bought a bunch of fimo half-priced at JoAnn on Saturday, and DH gave me a magnifying glass for Christmas, so I'm ready as soon as I finish the house! I also ordered a mini book off Amazon since I've had trouble finding tutorials online.
I also have a new project to tackle for late Spring, parts for which are coming in the Ernie order. ;)
0 Comments
Recommended Comments
There are no comments to display.