Jump to content

Irene's Blog

  • entries
    7
  • comments
    2
  • views
    6,460

The end is near, B&B is almost ready for guests


IAK

501 views

Been chuggin away at the interior of the B&B. The owners have really been buggin to get it done by the holidays and they are taking reservations already. Plus I picked up this awesome table to display it on. So far the bathroom is done and as you can see i cut slits into the tile and added spackle to give the floor a ceramic tile look.

blogentry-663-1193453089_thumb.jpg

and the third floor hallway, I added a skylight here

blogentry-663-1193453180_thumb.jpg

blogentry-663-1193453228_thumb.jpg

Then I moved on to the living room. The floor in here is a peel and stick tile and the french doors lead into the conservartory

blogentry-663-1193453354_thumb.jpg

I am currently working on the second floor bedroom. I should be done with it soon.

Okay I installed the carpet last night in the second floor bedroom....

blogentry-663-1193453588_thumb.jpg

furniture should be arriving soon :unsure:

After this room it's back up to the third floor to work on the 2nd bedroom there. That room is going to have a stone fireplace so back to the eggcrates.

0 Comments


Recommended Comments

There are no comments to display.

Guest
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...